Being unemployed hasn't helped my stress level much, but it's starting to have an effect on the various projects around here: I've got three four window sashes glued up. nine eight more to go. I glued up two remaining cabinet doors for the kitchen Also
Read More...
(Several of these are left over from 2007) Replace all the windows. (One down, six to go on the 1 st floor. Eight on the 2 nd .) Kitchen 100% done. Pay someone to replace the roof. Finish removing the asbestos siding. Strip, prep, and paint the exterior.
Read More...
One down, six to go. The “prototype” window is installed and fully functional. The exterior is primed but not painted; we have to wait for slightly warmer weather for that. We have a test color picked out and purchased – ready to go. Mom and dad came
Read More...
Or... "You can never own too many clamps." Nick's been busy the past few weeks using up all the salvaged fir we had left. There's enough wood for the sashes, but we'll have to buy wood for the frames. He glued up all the pieces, put them through the planer,
Read More...
Nick spent yesterday and the afternoon in the shop today. He cleaned up all the old fir that we have salvaged from the house. There were some old kitchen cabinet shelves and some old posts taken out of the walls. He cut them down to size and put them
Read More...
So Nick and I are back to work and Phil has gone back to Wisconsin. In all reality we won't be able to install the new window until Christmas time. That means Phil can be here when we do that, and it will give us enough time to prime the trim. (We are
Read More...
Success! The window is largely complete. It isn't installed; the sashes are currently installed in the frame, set up in my shop. It operates pretty well - I can slide the lower sash up and it stays in place, and I can slide the lower sash down and it
Read More...
Nick and Phil have been busy. They say it's going a bit slower than they thought, but since this is the first window, they are being very careful. A wrong cut on this project would be a huge setback. Here's a picture of the profile of the stiles and rails:
Read More...
Day One of window building is now complete. We started the day with a trip across town to Hardwick's hardware store, in search of a window-sash router bit set. In fact, we bought a sash bit last night at Rockler, but I pretty much decided to return it
Read More...
Phil arrived today and after we had lunch, he and Nick got down to the planning: The goal for this week is to build a double hung window to replace our original 1907 windows. This is the window they will be building a replacement for this week: They measured
Read More...
Nick made good progress in the shop last weekend. He moved the workbenches and built three cabinets to go along one wall. We began to get things reorganized but still have a bit to do. That will be our goal before Nick's dad, Phil, arrives next weekend.
Read More...
I'm now looking at windows from Loewen . Unfortunately the showrooms that sell them are only open during the week. Hopefully we can go look at some this week and then get a bid. I really like the fact that we could get fir trim for the inside. Then it
Read More...
For a long time Nick was planning on trying to refurbish the windows on the first floor which are original to the house and we would replace the aluminum-clad windows that are on the second floor that were installed in the 60's. But now that we are on
Read More...